Preventive Maintenance Checklists
Interactive inspection checklists for Chillers, Pumps, Transformers, DG Sets, and Fire Sprinkler systems.
Daily Central Chiller Plant Room Log & Inspection
Est. Duration: 20 mins • ASHRAE 15 / ISHRAE Standard
Weekly Diesel Generator (DG Set) & AMF Panel Audit
Est. Duration: 25 mins • ISO 8528 / NFPA 110 Level 1
Monthly HT/LT Substation & Switchgear Inspection
Est. Duration: 35 mins • IS 732 / IS 10028 / CEA Safety Regulations
Weekly Fire Sprinkler, Hydrant & Fire Pump Audit (NFPA 25)
Est. Duration: 30 mins • NFPA 20 / NFPA 25 Chapter 8 / NBC 2016 Part 4
Monthly Air Handling Unit (AHU) & VAV Filter Inspection
Est. Duration: 25 mins • ASHRAE 62.1 / ISHRAE IAQ Guidelines
Daily Sewage Treatment Plant (STP) & Effluent Quality Log
Est. Duration: 25 mins • CPCB / State Pollution Control Board Norms
MEP Plant Room Audit Log
Statutory Inspection Form • ISO 55001 Asset Maintenance Record