Centrifugal Chiller Plant Normal Start & Stop Procedure

Curated by: MEP Details PE Engineering Board
Est. Duration: 30 - 45 mins
Hazard Classification: Level 2 - Pressurized Equipment & Rotating Machinery
Last Revised: Sep 14, 2026
Live On-Site Execution Tracker
Interactive Step Verification 0 / 0 Done (0%)

1. Purpose & Scope

Standard operating procedure for the safe sequential start-up, operational monitoring, and shutdown of water-cooled centrifugal chiller plants conforming to ASHRAE Guideline 22.

2. Personal Protective Equipment (PPE) & Hazards

  • Safety Shoes & Eye Protection (Face Shield)
  • Hearing Protection (Ear Muffs)
  • High pressure refrigerant R-134a / R-1234ze hazard
  • 415V / 3.3kV High voltage starter panels

3. Sequential Execution Steps

  1. Energize Cooling Tower & Condenser Water Circuit: Start the cooling tower fan on VFD low speed (20 Hz). Start designated condenser water pump (CWP). Verify condenser water flow switch proves on BMS within 15 seconds.
  2. Energize Primary / Secondary Chilled Water Pumps: Start primary chilled water pump (PCHWP). Open motorized isolation valve on active chiller evaporator barrel. Confirm differential pressure across evaporator barrel is between 0.3 – 0.6 bar (4.5 – 9 PSI).
  3. Initiate Chiller Microprocessor Start Command: Switch chiller control panel from LOCAL OFF to AUTO / REMOTE START. The unit will initiate lubrication pre-lube cycle for 60 seconds (Oil pressure >= 25 PSI above suction).
  4. Monitor Compressor Acceleration & Soft-Start: Observe motor starter ramp up (Star-Delta or VFD). Verify running current stabilizes below Full Load Amps (FLA). Confirm guide vanes modulate slowly from minimum position.
  5. Verify Steady-State Operating Parameters: After 15 minutes of operation, log parameters: Chilled Water Leaving (44°F / 6.7°C), Condenser Entering (85°F / 29.4°C), Approach Temperature (< 2.0°F), Oil Temp (130-145°F), Motor Amps.
  6. Chiller Normal Shutdown Sequence: Select NORMAL STOP on panel. Microprocessor unloads guide vanes to 0%, opens recycle bypass, trips main compressor motor, runs post-lube oil pump for 180 seconds, and shuts down chilled/condenser water pumps after 5 minutes.

Engineering Audit & Operational Sign-Off

Record verification in facility maintenance log book conforming to NBC 2016 Part 8 / IS 732 / OSHA 1910.147.