1. Purpose & Scope
Standard weekly inspection and on-load testing of emergency diesel generators to guarantee compliance with NFPA 110 Level 1 emergency power standards and ISO 8528.
2. Personal Protective Equipment (PPE) & Hazards
- Hearing Protection (Ear Muffs) & Safety Shoes
- Hot exhaust manifold (> 500°C) & high pressure diesel fuel injection leaks
3. Sequential Execution Steps
- Perform Pre-Start Physical Walkaround: Check for any oil, water, or diesel fuel leaks beneath engine bed. Ensure intake louvers are unobstructed and exhaust flap is free to open.
- Initiate Manual Test Run (No-Load Mode): Turn selector switch on Deep Sea / ComAp controller to MANUAL and press START. Engine must crank, fire, and reach 1500 RPM (50 Hz) or 1800 RPM (60 Hz) within 6 seconds.
- Verify Alternator Voltage & Lube Oil Pressure: Confirm generated voltage stabilizes at 415V ± 1%. Confirm lube oil pressure builds rapidly to 4.5 – 6.0 bar (65 – 85 PSI).
- Simulate Grid Power Failure (On-Load AMF Test): Open mains incomer breaker. Confirm ATS transfers essential emergency load to DG within 10 seconds. Run under load for minimum 30 minutes.
- Restore Grid & Cool-Down Sequence: Re-close mains utility power. Confirm ATS transfers load back to grid seamlessly. Allow DG engine to idle at no-load for 5 minutes cool-down before automatic shutdown.
- Return Controller to AUTO Ready Mode: Set mode selector switch back to “AUTO”. Log run hours, fuel consumption, battery voltage, and oil pressure in DG Plant Log Book.
Subscribe to Read Full Engineering Publication
This verified technical document contains complete mathematical derivations, IS/NBC 2016 code references, equipment sizing schedules, and AutoCAD DWG blueprints.